Is Your Renovation Quote Missing Hidden Costs?
Upload or photograph your trade or builder quote. Let our AI audit for omitted trade stages, flag potential under-budget allowances, consider regional statutory compliance, and give you the questions to ask before agreeing to the scope or order of home renovation works.
AI-Assisted Pre-Signing Scope Diagnostic Advisory
The 4 Biggest Traps in Builder & Trade Quotes
Some reasons why 50–75% of home renovations experience budget blowouts and scope creep before the halfway mark. Getting the scope or order of works wrong can be costly.
The "Demolition & Waste" Illusion
Quotes frequently state "demolition included" but quietly exclude skip bin hire, tipping fees, or council road permits. Disposal fees can add thousands to a project. For older homes with asbestos the disposal and removal cost is a risk.
Unrealistic Prime Cost (PC) Allowances
Example: Builders might quote $30/sqm for tiles or quote for low cost tapware to keep their price competitive. But when you then choose more luxury fixtures or features, the difference comes straight out of your pocket.
Missing Statutory Compliance Certification
An Australian example: In wet area renovations, AS 3740 waterproofing certificates (an Australian standard) and plumbing sign-offs are mandatory for home insurance. Vague quotes often omit who pays for third-party certifications.
"Labor Only" / Prep Exclusions
Example: A tiler and floor layer might quote "labor only" on the assumption of a perfectly flat, prepped subfloor. When floor leveling or timber packing is needed, a higher hourly variation rate might be charged.
Frequently Asked Questions
Everything you need to know about auditing renovation quotes before committing.
- Trade Sequence: Verify that every phase is accounted for—demolition, structural prep, rough-in, waterproofing, plastering, fit-off, painting, and site clean-up.
- Allowances: Check whether fixture allowances (tiles, tapware, appliances) match real-world prices or are lowball placeholders.
- Exclusions: Look closely at the fine print for common exclusions like subfloor levelling, electrical switchboard upgrades, or council certifier fees.
- Automated Diagnostic: You can upload your PDF or photo to our free AI Quote Checker above to automatically cross-check your line items against regional building standards and trade checklists.
- Verify Credentials: Check your contractor's active trade license, public liability insurance, and statutory Home Building Compensation / Warranty Insurance on your regional government registry.
- Check Deposit Limits: Ensure the deposit complies with statutory laws (e.g. capped at 5% to 10% maximum depending on contract value in most Australian states).
- Document Changes in Writing: Ensure every verbal discussion, material change, or inclusion is reflected in the written contract or annexed specification sheet.
- Clarify Variations: Establish the exact written approval process and builder margin percentage applied to variations before work begins.
- You request changes to design, fixtures, or scope (homeowner variations).
- Actual supply costs exceed stated Prime Cost or Provisional Sum allowances.
- Unforeseen latent defects are uncovered (e.g., hidden termite damage, illegal wiring, or rotted timber lintels) that could not have been reasonably identified during the site inspection. These must still be documented in a written variation before extra charges apply.